The Fourth Wall of the Great Fortress of Prospero
![]() |
The
ceiling truss is almost finished. There is a few more pieces of the
catwalk on the ground that still need to be put up on the truss |
![]() |
Another backstage glimpse into the the house while under construction. |
![]() |
On March 9th, 2011, The crew put scaffolding across the stage. |
![]() |
The Atlas Brick Truck delivers a load of cinder blocks. The blocks are loaded into the house with a fork lift |
![]() |
Front of House Preview
![]() |
A white curtain has been installed on the elevator door on the ground floor |
![]() |
Another Sneak Peak into the house. via the Front of house. |
Previous Page: The Build Continues Next Page: St Patrick's Day